•  
  •  
  •  
  •  
 

Whitney Point CSD

Aquattica was hired by Whitney Point Central School District to renovate their pool, including upgrading the pool's equipment and making sure the pool was in compliance with all current codes.


Project Features
  • Stainless steel gutter
  • Pool tile depth markers
  • New marcite pool finish
  • Aqua Creek pool lift
  • One meter diving board and stand
  • Aqua-Tab chlorination system
  • UV light system



The project consisted of a complete renovation of the pool, equipment room, and hydraulic engineering.  The pool received a new marcite finish, grab rails with step inserts, and a stainless steel recirculation system.  All of the operational equipment in the mechanical room was replaced and a UV light system was added.


Project Location

24 Keibel Road
Lisle, NY 13862

Google Map




Aquattica News

P-KAST™

Patented Concrete Pool Structure

The P-Kast™ Pool System can be installed in a fraction of the time it takes to build a conventional swimming pool without any loss of structural integrity.  Modular construction results in additional cost savings by applying time tested and proven technological solutions to eliminate the excesses that are inevitable with conventional construction. P-Kast™ pools are structurally equal to gunite and structurally superior when compared to steel-walled modular pool structures.


Read More


Aquattica Special Features

Aquattica Special Services and Product Recommendations
Zero Depth Entry
Pool Toy Features
Evacuator™
Stainless Steel Gutter
Resistance Walk
UV Light System
Up Stream Jets

Read More